- May 17, 2010
- 0 Comments
So after 4 days at PRG in Longbridge, the lighting and video prep is complete. I’ve had the entire 10m x 6m Martin LC screen hanging in the warehouse to build the cable looms that will allow us to rig the screen in as short time as possible (so I can get back on the bus and get some sleep!). The control rack with processors for the LC and MiTRIX screens is ...
Read More